Russian projects
Name of power plant | Location of power plant | Total output of power plant | Number and type of equipment of power units (pcs. x type) | Parameters upstream of turbine plant | Beginning of commercial operation | ||
---|---|---|---|---|---|---|---|
Boiler | Turbine | Pbar | To C | ||||
Thermo-Electric Plant of ZIL motor works |
Moscow | 160 MW Hot water 660 Gcal/hr Steam 300 t/hr |
3xBKZ-320-170GM 2xPTVM-100 |
1xT-100/110-130-5 | 127.5 | 540 | 1981 |
Thermo-Electric Plant-3 |
Ivanovo | 330 MW Hot water 1584 Gcal/hr |
5xTP-87 2xPTVM-100 2xKVGM-100 |
1xPT-60-130 1xT-110/120 -130 1xPT-80/100-130/13 |
127.5 127.5 127.5 |
540 540 540 |
1991 |
Thermo-Electric Plant-2 Rehabilitation |
Ivanovo | 184 MW Hot water 480 Gcal/hr Steam 508 t/hr |
6xTP-170 2xBKZ-220-160 2xPTVM -100 |
3xPT-25/30-90/10M 1xR-50-130(90)/11 1xPT-60-90/13 |
88.3 127.5 127.5 |
500 540 540 |
1980-1992 |
Novo-Voronezhskaya Nuclear Power Plant. The second circuit of Unit No.5 |
Novo-Voronezh | (12500) 1000 MW |
Reactor of type VVR-1000 |
2xK-500-65/1500 | 63.8 | 1981 | |
Kostroma TPS Update of Monitoring and Control Systems for Units I-VIII | Kostroma region, Volgorechensk | 3600 8 x 300 1x1200 |
TGMP-114 | K-300-240 K-1200-240 |
235.5 | 540 | 1989 |
Dzerzhinsk Heating and Power Plant Modification of the boilers for gas burning | Gorky region Dzerzhinsk town |
590 MW | 1xTGM-88 2xBKZ-420-140 4x-420-140NGM 4xPTVM-180 |
1xP-50/130-13 1xT-100/130 2xPT-135/165-130/15 |
127.5 127.5 127.5 |
540 540 540 |
|
Thermoelectric Plant-2. Extension of TEP. Redesign | Kostroma | 170 MW | 4xBKZ-210-140 4xPTVM-100 |
1xPT-60-130 1xT-110/120-130 |
127.5 | 540 | 1991-1992 |
Heating and Power Plant No.20 Basic equipment modernization | Moscow | 690 MW Hot water 2405 Gcal/h |
3xTP-170 3xTP-230 5xTP-87 3xPTV-100 5xPTVM - 100 2xP -180 1xTGM-84B |
4xPT-25-4 1xPT-60-90 4xT-100/130 1xT-100/130 |
88.3 88.3 127.5 127.5 |
500 500 540 540 |
1986-1989 |
Thermoelectric Plant-2 Extension | Lipetsk | 515 MW Hot water 1900 Gcal/h |
3xTGM-96B 3xTGME-464 2xPTVM -180 2xKVGM -180 |
1xPT-135/160-130/15 2xPT-80/100-130/13 2xT-110/120-130/13 |
127.5 127.5 127.5 |
540 540 540 |
1978-1991 |
Cherepetsk TPS Rehabilitation, Units I-IV | Tula region Suvorov town | 1800 MW 63 Gcal/h |
7xTP-240-1 1xTP-51 2xTPP-100 1xP-50J |
4xK 150/1 3K 300/240-1 |
170.0 240.0 |
550/520 560/565 |
1991-1997 |
Heating and Power Plant No.1 Rehabilitation | Ivanovo | 30 MW Steam - 200 t/h Hot water - 200 Gcal/h |
2xGM-50+4xKVG-3GM 2xE-50-3.9-440GM 8xDE-25-1.4-225 GM |
2xR-12/35+1xR-6/35 | 39 | 425 | 2001 |
IvGRES TPS Modification for working as a District Heating Plant |
Ivanovo region Komsomolsk town |
60 Gcal/h |
2xGM50-1,4 |
2000 | |||
North-West combined-cycle power plant. Evaporator plant, Condensate polishing plant, I&C of auxiliary plants | St.Petersburg | 450 MW | 4xKU273/61-8,0/0,65 | 2xT-150-7,7 4xV 94,2 |
77/6 | 522/199 | 2001 |
Mutnovskaya Geothermal PowerPlant. Units 1 & 2 |
Petropavlovsk-Kamchatsky | 2x25 MW | - | 2xK-25-06Geo | 6.5 | 161 | 2002 |
Gas-Turbine Power Plant of Central Processing Facilities of Yuzhno-Shapkinsky Oil Field | Komi Republic, Usinsk City | 4x6 | 4xGTU-6RM | - | - | 2004 | |
Combined Cycle Power Plant for Rodnikovskaya Generation Company | Ivanovo region, Rodniki Town |
12 MW | - | - | - | - | 2008 |
Tereshkovo GTPP - Combined Heat and Power Plant | Moscow | 170 MW 150 Gcal/h |
3xHeat Recovery Steam Generators by Aalborg (Denmark) | 1 x Steam Turbine MTD 40CE, Skoda (Czechia) 3xGas Turbine GE LM 6000 PD Sprint (USA) |
4.5 | 463 | 2008 |
Kojuhovo GTPP - Combined Heat and Power Plant | Moscow | 170 MW 270 Gcal/h |
3xHeat Recovery Steam Generators by Aalborg (Denmark) 2xPeak-load hot water boilers PTVM-60, Drogobuzhkotlomash (Russia) |
1 x Steam Turbine MTD 40CE, Skoda (Czechia) 3xGas Turbine GE LM 6000 PD Sprint (USA) |
4.5 | 463 | 2008 |
Yuzhnaya CHP-22 | St.Petersburg | 450 MW | Pr-228/47-7,86/0,62-515/230 | 1x Steam Turbine T-125/150-7,4 1x Gas Turbine GTE-160 |
7.26 | 514.1 | 2009 |
Extension of Cherepetskaya thermal power plant, Units No.8 & 9 | Suvorov townTula region | 2 x 225 MW | Coal-fired boiler 2 x Ep-630-13,8-565/570(Taganrog branch of EM Alliance) | Steam turbine 2 x K-225-12,8-4P (Power Machines C LMZ) | 130 | 561 | 2012,2013 |
CCPP - CHP GSR-Energo Kolpino |
St. Petersburg,Kolpino | 2 x CCPP 110MW / ~77 Gkcal/h | Two double pressure HRSGhorizontal type, 116 t/h / 16t/h (Machine-building plant ZIO-Podolsk) | Two gas turbines PG6111FA of GE 77.4 MWTwo steam turbines T x 25/33-7.7 / 0.12Kaluga turbine plant33/25 MW / ~71 Gkcal/hGas turbine SGT5-4000F 278.5MW of Siemens; | 34 (g)HP steam76.2 LP steam6.3 | 27 HP steam531HP steam216 | 2011,2014 |
420-T combined cyclepower plant forthermoelectric plantNo.20 - Affiliate of Mosenergo | Moscow | CCPP 420 MW/~220 Gkcal/h | Three-pressure HRSG(Machine-building plant ZIO-Podolsk) | One (1) gas turbine plantCGTS-4000F("Siemens")Cogeneration steam turbine SST5-5000~140MW / ~220 Gkcal/h (Siemens) | 30.2 (g)HPsteam-119hot reheat steam-29LP steam - 4.2 | 60-130 LP steam-535hot reheat steam-535LP steam-232 | 2014 |
Novomoskovskaya GRESextension | Novomoskovsk,Tula | CCPP 190 MW / ~110 Gkcal/h | Double pressure HRSG,horizontal type 188t/h/ 34 t/h (ZIOMAR, Podolsk) | Gas turbine PG 9171E 126.1 MW (GE, USA)Steam cogeneration turbine SST-600 62/42 MW / ~100 Gkcal/h (Siemens) | 26.6-30 (g HP steam-70.5LP steam-6.5) | 27 HP steam-505LP steam-213 | 2011 |
Tomskaya GTP-16 | Tomsk | GTP 16 MW | Hot-water boiler100 Gkcal/h | Gas turbine16 MW | - | 27 | 2012 |